CAPITAL PLACE - FOUR SEASON PROJECT
Sunday, November 13, 2016
Saturday, February 27, 2016
PERSYARATAN PERMOHONAN SLF 2015
Persyaratan Formulir Permohonan Sertifikat Laik Fungsi (SLF) :
1. Surat Permohonan diatas kop Instansi atau perusahaan bagi yang berbadan usaha yang ditandatangani Penanggung Jawab Instansi / Perusahaan (Materai 6000)
2. Formulir permohonan Sertifikat Laik Fungsi
3. Surat Pernyataan Kebenaran Dokumen
4. Fotokopi Kartu Tanda Penduduk (KTP) Pemohon
5. Fotokopi Nomor Pokok Wajib Pajak (NPWP)
6. Fotokopi Akte Perusahaan
7. Fotokopi Bukti Kepemilikan Tanah
8. Fotokopi Surat Izin Penunjukan Penggunaan Tanah (SIPPT) untuk lahan lebih dari 5.000 m2
9. Fotokopi Surat Perjanjian Pemenuhan Kewajiban SIPPT
10. Fotokopi Berita Acara Serah Terima (BAST) dari BPKAD Prov. DKI Jakarta
11. Fotokopi Izin Bangunan terdahulu (IMB, KMB, dan SLF)
12. Gambar Arsitektur lampiran SK IMB dan Perizinan Terakhir yang diterbitkan 1 (satu) set
13. Keterangan Rencana Kota (KRK) & RTLB yang menjadi lampiran IMB, 3 (tiga) set
14. Surat Pernyataaan telah membuat SRAH / Kolam Resapan
15. Foto SRAH / Kolam Resapan dan foto tampak Bangunan minimal 2 sisi, sesuai keadaan lapangan
16. Laporan Direksi Pengawas oleh Pengawas yang memegang Izin Pelaku Teknis Banguan (IPTB) untuk SLF Pertama 3 (tiga) set
Laporan Kajian Teknis oleh Pengkaji yang memegang izin Pelaku teknis Bangunan (IPTB) untuk SLF Perpanjangan 3 (tiga) set
17. Legalisir Fotokopi IPTB Bidang :
• Arsitektur
• Konstruksi
• Instalasi (LAK)
• Instalasi (LAL)
• Instalasi (SDP)
• Instalasi (TDG)
• Instalasi (TUG)
18. Surat Pernyataan Koordinator Direksi Pengawas / Pengkaji Teknis
19. Gambar (As built drawing) hasil pelaksanaan bangunan yang telah ditandatangani pemilik IPTB 3 (tiga) set
• Struktur Bawah
• Stuktur Atas
• Arsitektur
• Elektrikal
• Elektronik
• Instalasi Tata Udara
• Fire Fighting
• Vertikal Transportasi
• Plumbing
20. Gambar (As built drawing) Arsitektur, Konstruksi, Instalasi hasil pelaksanaan bangunan yang telah ditandatangani pemilik IPTB dalam bentuk CD berisikan format CAD
21. Surat Keterangan Selesai Membangun untuk SLF Pertama
22. Rekomendasi dari Dinas Penataan Bangunan Prov. DKI Jakarta sesuai Pergub 146 tahun 2015
23. Rekomendasi dan Ijin dari Instansi / Unit Terkait:
a. Proteksi Kebakaran
Rekomendasi dari Dinas Pemadam Kebakaran saja.
b. Ijin Penggunaan Instalasi Penyalur Petir
Pengetesan dari DISNAKER - Rekomendasi dariDISNAKER – Pengesahan dari PTSP
c. Ijin Pemakaian Pesawat Angkat dan Angkut :
1. Lift
Pengetesan dari PJK3 - Rekomendasi dariDISNAKER – Pengesahan Pemakaian Lift dariPTSP
2. Escalator
Pengetesan dari PJK3 - Rekomendasi dariDISNAKER – Pengesahan Pemakaian Lift dariPTSP
d. Ijin Pemakaian Pesawat Angkat dan AngkutGondola
Pengetesan dari DISNAKER - Rekomendasi dariDISNAKER – Pengesahan dari PTSP
e. Ijin Penggunaan Motor Diesel
Pengetesan dari DISNAKER - Rekomendasi dariDISNAKER – Pengesahan dari PTSP
f. Ijin Instalasi Listrik
Pengetesan dari PJK3 - Rekomendasi dariDISNAKER – Pengesahan Pemakaian Instalasi Listrikdari PTSP
g. Ijin Penggunaan Instalasi Proteksi Kebakaran
Pengetesan dari DISNAKER - Rekomendasi dariDISNAKER – Pengesahan dari PTSP
h. Ijin Pembuangan Air Limbah (STP) dr Dinas Tata Air
Pengetesan dan Rekomendasi dari Dinas Tata Air
24. Surat Kesanggupan pembayaran retribusi apabila diperlukan
25. Surat Kuasa dan Fotokopi KTP yg dikuasakan
Monday, February 22, 2016
MEP WORKS SEQUENCING in ST REGIS - FOUR SEASON -CAPITAL PLACE JAKARTA
SEQUENCING OF MEP WORKS
I. MEP 1st Fix
|
1. Builder's work, Sleeves, Openings
|
2. Exposed Conduit for Elect.
|
3. Installation of Cable Tray for Elect.
|
4. Exposed Conduit for ELV
|
5. Installation of G.I. Trunking for ELV
|
6. Drainage Pipe work
|
7. Water Supply Pipe work
|
8. Gas Pipe work
|
9. Fire Fighting Pipe work
|
10. Pre-Insulated Duct Installation
|
11. Chilled Water Pipe Riser
|
12. Installation of Pressurization Duct
|
13. Chilled Water Pipe work
|
14. Partial testing
|
II. MEP 2nd Fix
|
1. Wiring for Lighting & Power
|
2. DB & Isolator Installation
|
3. Termination of DB's.
|
4. Cabling from DB's to SMDB's.
|
5. Cable Termination
|
6. MCC Installation & Cabling to Motors
|
7. Cables Installation for Telephone & Data
|
8. Cables Installation for Fire Alarm
|
9. Cables Installation for BMS
|
10. Cables Installation for CCTV & A.V.
|
11. Cables Installation for MATV
|
12. Cables Installation for Public Address
|
13. Cables Installation for Card Access
|
14. Bus Duct Installation
|
15. Earthing works
|
16. Install transformer
|
17. Install generator set
|
18. Drain & Cleanout works
|
19. Water Piping Accessories Installation
|
20. Fire Piping Accessories Installation
|
21. Fire Hose Cabinet Installation
|
22. Install Pumps & Accessories
|
23. Gas Piping Accessories Installation
|
24. Install Gas vessels & Ancillaries
|
25. Ducting Accessories Installation
|
26. Insulation for Chilled Water Pipe works
|
27. FCU/AHU Installation
|
28. Jet Fan Installation
|
29. Smoke Exhaust Fan Install
|
30. Exhaust Fan Install
|
31. Fresh Air & Treated Fresh Air Fans Installation
|
32. CHW Pressurization Fan Install
|
33. PCWRP Primary Chilled Water Pump Install
|
34. Partial testing
|
III. MEP Final Fix
|
1. Wiring Devices Installation
|
2. Light Fixture Installation
|
3. Sanitary wares Installation
|
4. Fire Extinguisher/Devices Installation
|
5. Installation of Telephone & Data Devices
|
6. Installation of Fire Alarm Devices & FACP
|
7. Installation of BMS Devices
|
8. Installation of CCTV & A.V.(By Others) Devices
|
9. Installation of MATV Devices
|
10. Installation of Public Address Devices
|
11. Installation of Card Access Devices
|
12. Diffuser and Grille
|
IV. Testing & commissioning
|
Testing & Comm. for Electrical works
|
Testing & Comm. for Water supply works
|
Testing & Comm. for Drainage works
|
Testing & Comm. for H.V.A.C. works
|
Testing & Comm. for Fire Fighting works
|
Testing & Comm. for Telephone & Data works
|
Testing & Comm. for Fire Alarm works
|
Testing & Comm. for BMS works
|
Testing & Comm. for CCTV works
|
Testing & Comm. for MATV works
|
Testing & Comm. for Public Address works
|
Testing & Comm. for Card Access works
|
Testing & Comm. of Generator Sets
|
Testing & Comm. of Audio/Video System(By Others)
|
Testing & Comm. of UPS System
|
Sunday, February 21, 2016
HOW TO RUN THE PROJECT
Dear Construction Guys,
I want to share and give some opinion or advice as external view.
PROJECT TEAM
Leader of the project is the Project Manager so he has to be onsite everyday except something to be done out of project.
Request to the Owner/Construction Management for daily meeting at 08.00 am.
Automatically the project team will be on site before 08.00 am and PM will lead internal meeting with the team at 07.30 am.
This is what happened in St Regis Project since I am as the Deputy Project Director and Senior Project Manager. We instruct to CM to conduct the daily meeting at 08.00 am with the Contractor.
SENSE OF BELONGING
Put some slogan WE ARE APG or YOU ARE IN APG PROJECT or some slogan that encourage the project team.
UNIFORM
All project team has to proud to their job. We are the Construction guys so the uniform should be made for the construction purpose.
Right arm and left arm for the pencil and pen, shoulder sleeve for HT etc.
I believe that APG already had the uniform but why they didn't use it.
FORMAL AND INFORMAL COMMUNICATION
Project team should check in the contract what kind communication accepted and as the part of the project communication contract.
Should be by hard copy with received letter, fax with confirmation, courier.
For the email is not the part or contract communication.
But different project is different clause depend on the contract document.
Better project team propose for shorting the time the Contractor can submit RFI, Material Approval, Method Statement, Progress Payment, Shop Drawing, Daily Report, Monthly Progress etc by email to the CM and The Owner.
This is to give advance information because some project the Owner /CM on Saturday/Sunday/ National Holiday they don't come to site.
Contractor will lose the time. Contract period is calendar day not working day.
And for internal between Project and head office use email as well.
HSE (HEALTH SAFETY ENVIRONMENTAL) in k
I believe that AK and APG had certified by OHSAS (Occupational Health & Safety Advisory Services)
The main purpose of Project Safety is Zero Accident.
As we know that in the world is only Safety with No Target. All activity of project has target.
How to get the Zero Accident is easy and simple.
PM has to care that safety is the mandatory.
Put Safety Manager in the neck of Organisation Chart it means Safety Manager is independence and under PM directly.
Below is some activity to be done :
Daily morning tool box meeting by each Supervisor and PPM
Weekly Safety Tool Box Meeting has to be attended by PM and all staff include foreman and worker plus all Sub Contractor -Direct Contractor as well.
Safety patrol to be conducted by all safety officer include Sub Contractor and Direct Contractor safety officer and invite CM and Owner to join as well.
Safety Induction to be conducted for all new worker in the safety induction room with signed by each worker.
Fine to be applied for any violation of the safety rule.
Fine to be applied for all foreman and Sub Contractor SM if they don't join in the weekly safety tool box meeting.
Put and install sign and slogan of Safety manner.
HOUSE KEEPING
Put in the contract with Mandor or Sub Contractor for the rubbish manner.
If the area is dirty or nor tidy the supervisor should clean by themselves.
Security should clean and take if any cigarette surrounding security post and fine them.
WORKING HOURS
As we know that morning and daytime is more productive than evening or night time.
So why we do the project in the night specially for the project staff team.
Yes, we should do project in overtime but this is for site people only and some office staff. No need more than 06.30 pm. People on site more than 12 is more tan enough.
PM should be on site 08.00 PM latest.
All equipment such as TC, Genset, PH, Excavator should be operated on 07.30 latest.
Principally make it project is busy look like market at 08.00 am.
Of any staff doesn't want to follow the rule dismiss him.
Easy and simple.
LUNCH TIME
Project prepare lunch for all staff and for the key persons : PM, PPM, PEM, PFM, MEP Manager, Structure Engineer, HSE Manager, QAQC Manager Lucy together in the meeting room on time 12.00 am.
The purpose are making time efficient and more closer each other.
Rest time is rest so after lunch then go prayer then take some rest.
This is what Ssyangyong doing.
PROGRAM
Contractor has to have the Internal and External Program (Schedule).
Internal Program must be earlier than External Program.
All site team has to have the Weekly and Daily Program and put in their pocket.
This is the basic how to control and evaluate the program.
Planner (Scheduler) should control and report to PM what is going on.
Dear Bapak And Ibu,
The above sharing is my opinion and what I know during dealt with International Company plus in Overseas Construction and from my experiences.
I believe different PM is different how to manage the project.
For the next email I will send some method or Safety Picture.
Thanks and regards,
Heri Atmoko
Sent from my iPhone