TOWER CRANE | |
THE CONSIDERATIONS OF THE TOWER CRANE PLACEMENT | |
1 | The type of TC will be used. |
2 | The height of Building or Tower will be built. |
3 | How to dismantle the TC. |
4 | How much the heaviest material or equipment to be lifted. |
5 | Where is the Fabrication area? |
6 | Where is the unloading material? |
7 | Where is the temporary access? |
8 | Avoid the MEP Room/Void (eq. STP, Chiller, Genset, GWT, Escalator, etc). |
9 | Avoid the Pool Area |
10 | Check the position of other TC. |
11 | Check the existing building next to our project. |
12 | Check the PLN high tension cables. |
13 | Check the existing services under ground. |
14 | Check the plan of project beside our location. |