THE CONSIDERATIONS OF THE TOWER CRANE PLACEMENT
   
1 The type of TC will be used.
2 The height of Building or Tower will be built.
3  How to dismantle the TC.
4 How much the heaviest material or equipment to be lifted.
5 Where is the Fabrication area?
6 Where is the unloading material?
7 Where is the temporary access?
8 Avoid the MEP Room/Void (eq. STP, Chiller, Genset, GWT, Escalator, etc).
9 Avoid the Pool Area
10 Check the position of other TC.
11 Check the existing building next to our project.
12 Check the PLN high tension cables.
13 Check the existing services under ground.
14 Check the plan of project beside our location.
   