| TOWER CRANE | |
| THE CONSIDERATIONS OF THE TOWER CRANE PLACEMENT | |
| 1 | The type of TC will be used. |
| 2 | The height of Building or Tower will be built. |
| 3 | How to dismantle the TC. |
| 4 | How much the heaviest material or equipment to be lifted. |
| 5 | Where is the Fabrication area? |
| 6 | Where is the unloading material? |
| 7 | Where is the temporary access? |
| 8 | Avoid the MEP Room/Void (eq. STP, Chiller, Genset, GWT, Escalator, etc). |
| 9 | Avoid the Pool Area |
| 10 | Check the position of other TC. |
| 11 | Check the existing building next to our project. |
| 12 | Check the PLN high tension cables. |
| 13 | Check the existing services under ground. |
| 14 | Check the plan of project beside our location. |